• HOME
  • ABOUT US
  • SERVICES
    • Piling
    • Bridges Marinas & Docking Facility Construction
    • Soil Improvement
    • Civil Works
    • Coastal Protection
    • Offshore Installation
    • Quality Control & Safety
    • Freight & Fabrication Services
  • EQUIPMENT
  • PROJECTS
    • Apsara Samudra Restaurant
    • Bridgetown Port Berth 5
    • Rodney Bay Marina
    • The Great House
    • Sandals Phase II
  • OUR TEAM
  • CONTACT US
✕
Apsara Samudra - cave and cliff erosion
Apsara Samudra - Stabilise and fill the undercut cliffThe cave and cliff eroded by the ocean.
Cross section of the concrete pour at Apsara Samudra
Apsara Samudra - cross sectionCross section of the concrete pour at Apsara Samudra
Apsara Samudra - Inner Manhole, concrete fill
Apsara Samudra - Inner ManholeInner Manhole - Phase One, filling the void under the existing built structure.
Apsara Samudra - undercut cave
Apsara Samudra - undercut caveThe cave that had been eroded and threatened the Apsara Samudra restaurant
Apsara Samudra - Outer Gabion - concrete fill
Apsara Samudra - Outer GabionPrimary Gabion Barrier: Required for Phase Two, the second concrete fill.
Apsara Samudra - Outer Manhole
Apsara Samudra - Outer ManholeOuter Manhole: Phase Two, the outer concrete fill.
© 2017 Marenco Marine. All Rights Reserved.